Topic(s): ESP-BAT-BT
What Happens if Scheduled Watering Times Overlap with the ESP-BAT-BT?
ESP-BAT-BT operates stations sequentially, so stations do not run at the same time.
If a scheduled watering start occurs while irrigation is already running, the additional watering is added to the watering queue rather than running simultaneously. Once the current watering finishes, the queued irrigation can run in order.
This prevents overlapping schedules from attempting to operate multiple stations at the same time.
Do you have suggestions to make this article more helpful?